Co-op Problem Solving

Work together to solve complex challenges and unlock the solution!

The Great Energy Challenge

Your team manages a city's power grid during a major storm. You need to optimize power distribution to keep essential services running while managing limited resources.

  1. Calculate the total power consumption of essential services (hospitals: 1000kW, emergency centers: 500kW, water treatment: 750kW)
  2. If backup generators can provide 40% of normal capacity, how much power must be conserved?
  3. Develop a plan to reduce non-essential power usage by identifying percentage cuts in different sectors
  4. Calculate how long the emergency power supply will last if it has 10,000kWh stored
  5. Create a priority list for restoring power to different areas based on your calculations

Team Discussion Area

🎯 Hover to Check Your Solution 🎯

Total Power: 2250kW
Required Reduction: 1350kW
Supply Duration: 4.44 hours
Suggested Priority: Hospitals → Emergency → Water